Equipment
BMZModular Buildings
Transportable buildings for control rooms, electrical equipment, laboratories and process systems.

Purpose
Provide a factory-complete protected space for equipment and personnel, engineered for climate and room classification.
Arrangement and integration
Equipment functional diagram
The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.
A typical equipment arrangement is shown. Final execution, redundancy and valve scope are established during engineering.
Engineering basis
Design parameters
Final ratings, materials and supply scope are established from project-specific operating data.
| Building duty | process, electrical, control-room or laboratory |
|---|---|
| Dimensions and transport | to installed equipment and delivery route |
| Climate and classification | to site climate and room classification |
| Factory completion | utilities, finishes and testing as specified |
Process functions
Principal process duties
- Housing process or electrical equipment
- Maintaining the required indoor climate
- Fire, gas and security systems as required
Typical scope
Main equipment
- 01
Main process vessel or package
- 02
Skid, supports, platforms and piping
- 03
Valves, instrumentation and protection systems
- 04
Insulation, heat tracing, shelter and electrical systems as required
Questionnaire
Data required for engineering
Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.
- 01
Process fluid and physical properties
- 02
Flow, pressure and temperature for all cases
- 03
Required process result and allowable pressure drop
- 04
Materials, climate and installation category
- 05
Dimensional constraints, battery limits and automation requirements
Proposal request
Operating data for a technical and commercial proposal
Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.
Email the questionnaire, specification and attachments