Produced-water removal at elevated pressure
MUPSV / 01

Produced-water removal at elevated pressure

Operating requirement
Reduce water load in the gathering system directly at the field site.
Outcome
At 1,000 m³/d total liquid, the unit removed 750 m³/d water with 14 mg/L residual oil.
Surface package for well start-up and testing
WELL TEST / 02

Surface package for well start-up and testing

Operating requirement
Provide pressure control, separation, metering and controlled outlet routing before permanent tie-in.
Outcome
The facility is configured from mobile functional modules around the test program and available receiving points.
Modular gas metering facility
GAS METERING / 03

Modular gas metering facility

Operating requirement
Integrate metering runs, instrumentation and support systems in a factory-complete module.
Outcome
Process and electrical systems are assembled in one transportable configuration.
Automated oil-well production metering
AGZU / 04

Automated oil-well production metering

Operating requirement
Provide well switching, separation and multiphase production measurement in field execution.
Outcome
Vessel, process piping and metering instruments are integrated into one process package.

Start with operating data

Preliminary process review based on operating data

Send a questionnaire, technical specification or a short description of the feed and required outlet streams.