
MUPSV / 01
Produced-water removal at elevated pressure
- Operating requirement
- Reduce water load in the gathering system directly at the field site.
- Outcome
- At 1,000 m³/d total liquid, the unit removed 750 m³/d water with 14 mg/L residual oil.



