Mobile facility

MKOS

Mobile Well Clean-up and Early Production Facility

An extended facility for receiving one or more wellstreams, multistage separation, treatment, metering and outlet routing.

Mobile Well Clean-up and Early Production Facility: Mobile well clean-up facility diagramMobile-facility boundaryClean-upwellstreamPressure controlSand and solidsremovalWellstreamseparationGas togathering orflareLiquid to tank,loading orgathering

Purpose

Combine well clean-up with temporary production processing and phased expansion of the facility.

Process arrangement

Simplified process diagram

The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.

MKOSMobile well clean-up facility diagramSimplified process diagram
Mobile Well Clean-up and Early Production Facility: Mobile well clean-up facility diagramMobile-facility boundaryClean-upwellstreamPressure controlSand and solidsremovalWellstreamseparationGas togathering orflareLiquid to tank,loading orgathering
Process mediumOil / emulsionGas

The process scope is established by the well clean-up programme. The diagram shows typical product routing after separation and does not replace the programme.

Engineering basis

Technical parameters

Final ratings, materials and supply scope are established from project-specific operating data.

Configurationtypically 5–10 transportable modules
Feedsingle well, well pad or temporary gathering line
Scalabilityby adding or replacing functional modules

Process functions

Principal process duties

  • Wellstream reception and solids capture
  • Multistage separation and pressure stabilization
  • Oil, water and gas treatment within agreed battery limits
  • Metering, storage and product dispatch
  • Facility reconfiguration as the asset develops

Typical scope

Main equipment

  • 01

    Inlet separation and solids-handling module

  • 02

    Subsequent two- and three-phase separation stages

  • 03

    Gas, water and oil process trains

  • 04

    Metering, loading, flare system and control room

  • 05

    Interconnecting piping, isolation, control and relief valves

  • 06

    Instrumentation, emergency shutdown and process control

Questionnaire

Data required for engineering

Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.

  1. 01

    Minimum, normal and maximum liquid, oil, water and gas rates

  2. 02

    Wellstream composition and physical properties

  3. 03

    Inlet pressure and temperature, allowable pressure drop

  4. 04

    Required outlet-stream quality and export destinations

  5. 05

    Climate, site category, available utilities and transport constraints

Proposal request

Operating data for a technical and commercial proposal

Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.

Email the questionnaire, specification and attachments

Facility composition

Principal equipment and process packages

The list reflects a typical functional structure. Process stages, redundancy and battery limits are established by engineering calculations.

Pump units in a modular package
BN / GNU / PS

Pumping Stations

Packaged pumping stations for oil, condensate, water, multiphase streams, wastewater and special fluids.

View details

Related scope

Equipment in the same category