Mobile facility

MBSNU

Compact Modular Separation and Loading Unit

A compact facility for wellstream separation, gas measurement, liquid buffering and truck loading.

Compact Modular Separation and Loading Unit: MBSNU simplified process diagramMobile-package boundaryOil and gasmixtureSeparatorSurge vesselLoading pumpSeparated gasOil to loading ortransfer

Purpose

Provide temporary production handling at low-rate, exploration and remote sites with limited plot space.

Process arrangement

Simplified process diagram

The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.

MBSNUMBSNU simplified process diagramSimplified process diagram
Compact Modular Separation and Loading Unit: MBSNU simplified process diagramMobile-package boundaryOil and gasmixtureSeparatorSurge vesselLoading pumpSeparated gasOil to loading ortransfer
Process mediumOil / emulsionGas

The simplified diagram identifies the principal process duties and product handover points. Final equipment scope is established from project data.

Engineering basis

Technical parameters

Final ratings, materials and supply scope are established from project-specific operating data.

Serviceoil-gas-water wellstream
Dutyseparation, metering, buffering and truck loading
Executiontransportable factory-complete modules
Capacityto well rates and product-dispatch schedule

Process functions

Principal process duties

  • Gas-liquid separation
  • Final degassing and oil buffering
  • Gas and liquid measurement
  • Automated truck loading
  • Gas routing to a consumer or flare system

Typical scope

Main equipment

  • 01

    Inlet separator with engineered internals

  • 02

    Buffer tanks and pumping module

  • 03

    Metering, loading and gas line

  • 04

    Instrumentation, emergency shutdown and process control

  • 05

    Power distribution, heat tracing, lighting and earthing

  • 06

    Maintenance platforms, shelters and transport provisions as required

Questionnaire

Data required for engineering

Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.

  1. 01

    Minimum, normal and maximum liquid, oil, water and gas rates

  2. 02

    Wellstream composition and physical properties

  3. 03

    Inlet pressure and temperature, allowable pressure drop

  4. 04

    Required outlet-stream quality and export destinations

  5. 05

    Climate, site category, available utilities and transport constraints

Proposal request

Operating data for a technical and commercial proposal

Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.

Email the questionnaire, specification and attachments

Facility composition

Principal equipment and process packages

The list reflects a typical functional structure. Process stages, redundancy and battery limits are established by engineering calculations.

Pump units in a modular package
BN / GNU / PS

Pumping Stations

Packaged pumping stations for oil, condensate, water, multiphase streams, wastewater and special fluids.

View details

Related scope

Equipment in the same category