Process solution / 03

Oil and Produced-Water Treatment

Treat streams closer to the well and reduce load on gathering and central facilities.

Send operating data
Target outcomeConditioned oil, separated water and controlled load on existing infrastructure.

Engineering sequence

How the solution is configured

01

Define oil and water outlet requirements

02

Engineer separation, heating, chemicals and polishing

03

Integrate with gathering, injection and metering

Related facilities

Potential mobile-facility scope

This is not a fixed package. Scope and capacity are established after the material balance is defined.

Start with operating data

Preliminary process review based on operating data

Send a questionnaire, technical specification or a short description of the feed and required outlet streams.