Permanent facility

KDFT

Tubular Terminal Phase Splitter

A tubular device for flow calming, gas disengagement and liquid distribution upstream of treatment equipment.

Tubular terminal phase splitter in a field facility
Tubular terminal phase splitter in a field facility

Purpose

Stabilize the inlet flow and reduce load on downstream separators.

Process arrangement

Simplified process diagram

The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.

KDFTTubular terminal phase splitter diagramFunctional diagram
Tubular Terminal Phase Splitter: Tubular terminal phase splitter diagramVessel boundaryMultiphasewellstreamInlet deviceTubular phasesplittingGasLiquid product
Process mediumOil / emulsionGas

The simplified diagram identifies the principal process duties and product handover points. Final equipment scope is established from project data.

Engineering basis

Technical parameters

Final ratings, materials and supply scope are established from project-specific operating data.

Serviceoil-gas-water mixture
Capacitygas and liquid rates for all cases
Design conditionspressure, temperature and allowable pressure drop
Separation criteriaproject-specific residual gas and liquid carryover

Process functions

Principal process duties

  • Momentum reduction and flow distribution
  • Preliminary free-gas separation
  • Flow distribution between process trains
  • Drainage and operating control

Typical scope

Main equipment

  • 01

    Tubular body and internal distribution devices

  • 02

    Supports, platforms and piping

  • 03

    Instrumentation and relief devices

Questionnaire

Data required for engineering

Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.

  1. 01

    Minimum, normal and maximum liquid, oil, water and gas rates

  2. 02

    Wellstream composition and physical properties

  3. 03

    Inlet pressure and temperature, allowable pressure drop

  4. 04

    Required outlet-stream quality and export destinations

  5. 05

    Climate, site category, available utilities and transport constraints

Proposal request

Operating data for a technical and commercial proposal

Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.

Email the questionnaire, specification and attachments

Facility composition

Principal equipment and process packages

The list reflects a typical functional structure. Process stages, redundancy and battery limits are established by engineering calculations.

Pump units in a modular package
BN / GNU / PS

Pumping Stations

Packaged pumping stations for oil, condensate, water, multiphase streams, wastewater and special fluids.

View details