Mobile facility

MUPG

Mobile Gas Treatment Facility

A modular facility for treating natural or associated gas to the requirements of a consumer, gathering line or pipeline.

Mobile Gas Treatment Facility: MUPG simplified process diagramMobile-unit boundaryRaw gasInlet separationFiltration andsweeteningGas dehydrationGas meteringTreated gasto pipelineCondensate andseparated liquidCompression whenrequired

Purpose

Provide temporary or early gas treatment with phased addition of separation, dehydration, sweetening, compression and metering.

Process arrangement

Simplified process diagram

The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.

MUPGMUPG simplified process diagramSimplified process diagram
Mobile Gas Treatment Facility: MUPG simplified process diagramMobile-unit boundaryOptional stageRaw gasInlet separationFiltration andsweeteningGas dehydrationGas meteringTreated gasto pipelineCondensate andseparated liquidCompression whenrequired
GasCondensate

The required sweetening, dehydration and compression stages depend on gas composition and receiving-system requirements.

Engineering basis

Technical parameters

Final ratings, materials and supply scope are established from project-specific operating data.

Servicenatural or associated petroleum gas
Capacityto minimum, normal and maximum gas rates
Gas specificationdew points, composition, pressure and heating value
Process routeengineered separation, dehydration, sweetening, cooling and compression

Process functions

Principal process duties

  • Inlet gas separation and filtration
  • Water and hydrocarbon dew-point control
  • H₂S, CO₂ and contaminant removal where required
  • Compression, cooling and pressure stabilization
  • Treated-gas metering and quality monitoring

Typical scope

Main equipment

  • 01

    Inlet separator and filter-separators

  • 02

    Engineered dehydration, sweetening and low-temperature section

  • 03

    Compression, air cooling and fuel-gas system

  • 04

    Gas metering and project-specific quality control

  • 05

    Instrumentation, emergency shutdown and process control

  • 06

    Power distribution, heat tracing, lighting and earthing

  • 07

    Maintenance platforms, shelters and transport provisions as required

Questionnaire

Data required for engineering

Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.

  1. 01

    Gas composition including H₂S, CO₂, N₂ and heavy hydrocarbons

  2. 02

    Flow, pressure and temperature for all operating cases

  3. 03

    Dew-point, heating-value and Wobbe-index requirements

  4. 04

    Consumer or custody-transfer pressure and specification

  5. 05

    Compression, redundancy and acid-gas disposal requirements

Proposal request

Operating data for a technical and commercial proposal

Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.

Email the questionnaire, specification and attachments

Facility composition

Principal equipment and process packages

The list reflects a typical functional structure. Process stages, redundancy and battery limits are established by engineering calculations.

Gas Separators
GS / FS / SK

Gas Separators

Gas separators, filter-separators and mesh separators for liquid-droplet and solids removal.

View details

Related scope

Equipment in the same category