Mobile facility

MUSK

Mobile Condensate Stabilization Unit

A facility for degassing, stabilizing and conditioning gas condensate for storage, transport or downstream processing.

Mobile Condensate Stabilization Unit: MUSK simplified process diagramMobile-unit boundaryUnstablecondensateFeed degassingHeatingStabilizer columnProductcoolingStabilizedcondensateOverheadcondensationStabilizer gas

Purpose

Reduce vapor pressure, remove light components and retain liquid hydrocarbons that would otherwise be lost or flared.

Process arrangement

Simplified process diagram

The diagram identifies the principal process duties, equipment connections and product handover points. Final scope, redundancy and battery limits are established from project data.

MUSKMUSK simplified process diagramSimplified process diagram
Mobile Condensate Stabilization Unit: MUSK simplified process diagramMobile-unit boundaryOverhead vapourRefluxUnstablecondensateFeed degassingHeatingStabilizer columnProductcoolingStabilizedcondensateOverheadcondensationStabilizer gas
GasCondensateRecycle

The simplified diagram identifies the principal process duties and product handover points. Final equipment scope is established from project data.

Engineering basis

Technical parameters

Final ratings, materials and supply scope are established from project-specific operating data.

Serviceunstable gas condensate
Capacityto condensate rate and operating envelope
Target propertyvapor pressure and storage specification
Stabilization routeengineered staged-separation or column process

Process functions

Principal process duties

  • Inlet gas-water-condensate separation
  • Heating and staged degassing
  • Condensate stabilization to the required vapor pressure
  • Flash-gas recovery or conditioning
  • Stable-condensate cooling, metering and export

Typical scope

Main equipment

  • 01

    Separation and heat-exchange modules

  • 02

    Engineered stabilization column or staged separation

  • 03

    Pumps, cooling, gas handling and metering

  • 04

    Instrumentation, emergency shutdown and process control

  • 05

    Power distribution, heat tracing, lighting and earthing

  • 06

    Maintenance platforms, shelters and transport provisions as required

Questionnaire

Data required for engineering

Worked examples and vessel-volume fields are retained. Use them as guidance or provide parameters from an existing design.

  1. 01

    Compositional and distillation data for unstable condensate

  2. 02

    Flow, pressure, temperature and water content

  3. 03

    Required vapor pressure and flash point

  4. 04

    Stabilization-gas use or disposal route

  5. 05

    Product storage and export requirements

Proposal request

Operating data for a technical and commercial proposal

Attach the completed questionnaire or provide the principal operating data below. Equipment scope, design ratings and battery limits follow engineering review.

Email the questionnaire, specification and attachments

Facility composition

Principal equipment and process packages

The list reflects a typical functional structure. Process stages, redundancy and battery limits are established by engineering calculations.

Pump units in a modular package
BN / GNU / PS

Pumping Stations

Packaged pumping stations for oil, condensate, water, multiphase streams, wastewater and special fluids.

View details

Related scope

Equipment in the same category